Quick answer: An aluminium cabinet project typically takes about 3 to 4 weeks from consultation to handover: design and measurement in week 1, off-site fabrication in weeks 2 to 3, and on-site installation in 2 to 5 working days. Because cabinets are fabricated in a workshop, installation is faster, cleaner and quieter than building cabinets on site.

Step-by-Step Timeline
| Step | What happens | Typical time |
|---|---|---|
| 1. Free consultation | We discuss your needs, layout, budget and finishes | Day 1 |
| 2. Site visit and measurement | We measure your space and check walls, plumbing and appliances | Week 1 |
| 3. Design and itemised quote | Layout, finishes and hardware are agreed; you receive a free itemised quote | Week 1 |
| 4. Fabrication | Cabinets are precision-fabricated in our workshop while any site work is done in parallel | Weeks 2 – 3 |
| 5. Installation | Cabinets, countertop and fittings are installed and quality-checked | 2 – 5 working days |
| 6. Handover | Final checks and adjustments, then handover | End of installation |
Timelines vary with kitchen size, complexity, countertop lead times and any renovation approvals.
Why Off-Site Fabrication Is Faster
Cabinets are cut and welded in controlled conditions while plumbing, electrical and other site work happens in parallel. On installation day the pieces fit together, so there is less dust, noise and disruption than on-site carpentry. See the kitchen renovation page for the full-renovation timeline.
How to Prepare
- Confirm appliance models and sizes before fabrication.
- Clear the kitchen and protect floors before installation day.
- Check HDB or condo renovation guidelines and working hours. See condo kitchen cabinets.
- Plan where you will cook for the few days of installation.
What Can Delay a Project
- Changing the layout or finish after fabrication has started.
- Late appliance delivery or incorrect appliance sizes.
- Countertop lead times.
- Approval requirements for gas or hood changes.
Ready to book a consultation? See pricing or contact us.
Frequently Asked Questions
Installation is usually completed within 2 to 5 working days, depending on kitchen size and complexity, because cabinets are fabricated off-site.
Most projects take about 3 to 4 weeks from consultation to handover, including design, fabrication and installation.
Installation is quick, but plan temporary cooking arrangements for the few days of work. We sequence the work to minimise downtime.
We recommend booking 2 to 3 weeks before your planned start date to allow time for design and fabrication.