Kitchen Renovation Singapore
Full kitchen makeovers, layout to countertop to cabinets, in one package.
We handle full kitchen renovations across Singapore, layout planning, countertops, backsplash and precision-fabricated aluminium cabinets, installed clean in days rather than weeks.
A Full Kitchen Makeover, Not Just New Doors
Kitchen renovation means more than swapping cabinet fronts, we cover the whole space.
Layout Planning
We reassess your kitchen's workflow, sink, hob and storage placement, before locking in a design.
Countertop & Backsplash
Quartz or solid surface countertops and tiled or solid backsplash, matched to your cabinet finish.
Aluminium Cabinetry
Honeycomb-reinforced, welded aluminium cabinets that won't warp from cooking heat or humidity.
Kitchen Renovation Cost in Singapore
| Renovation Scope | Includes | Estimated Price Range |
|---|---|---|
| Cabinets Only | Aluminium cabinetry, no layout change | S$3,000 - S$7,500 |
| Cabinets + Countertop | Cabinets, new countertop | S$5,500 - S$10,500 |
| Full Makeover | Layout change, cabinets, countertop, backsplash | S$9,000 - S$16,000 |
Every renovation starts with a free, itemised quote, so there are no surprise costs mid-project.
Kitchen Renovation Timeline
Week 1: Consultation & Design
Site visit, measurements, layout and material selection finalised.
Week 2-3: Fabrication
Cabinets are precision-built off-site while any demolition or plumbing work is completed on-site.
Final 2-5 Days: Installation
Cabinets, countertop and fittings are installed and quality-checked before handover.
Kitchen Layout Ideas to Consider
The right layout depends on your kitchen's shape and how you actually cook, not just what looks good in photos.
The Work Triangle Still Matters
Keeping your sink, hob and fridge within a short, unobstructed triangle reduces wasted movement while cooking, especially important in compact HDB kitchens where every step counts.
Galley vs L-Shape vs U-Shape
Galley layouts suit narrow kitchens and maximise counter space along two walls. L-shapes work well for open-concept homes, while U-shapes offer the most storage but need more floor area to feel comfortable.
Don't Forget Ventilation Placement
Hob and hood positioning affects ducting routes and renovation cost, worth confirming early, especially if you're relocating the cooking area from its original position.
Beyond layout, lighting is often underestimated in kitchen renovations. Under-cabinet lighting makes countertop work easier and safer, while warmer ceiling lighting near dining areas creates a more inviting feel. We factor lighting placement into the cabinet design stage rather than treating it as an afterthought once cabinets are already installed.
Renovation Mistakes That Cost You Later
Ignoring Ventilation Permits
Relocating gas points or hoods in HDB flats may require approval. We help you check this before committing to a layout change.
Choosing Cheap Hardware
Hinges and drawer runners see the most daily wear. Cutting costs here is the fastest way to a kitchen that feels tired within two years.
Not Planning for Appliances
Built-in oven, microwave and dishwasher sizes need to be confirmed before cabinet fabrication, not after.
Overlooking Bin and Recycling Space
A dedicated pull-out bin drawer is a small addition during fabrication but a major retrofit afterward.
Why Off-Site Fabrication Speeds Up Installation
A common misconception about kitchen renovation is that the cabinets are built inside your home during the renovation itself. In reality, the fastest and cleanest renovations happen when cabinetry is precision-fabricated off-site while site preparation, plumbing and electrical work happen in parallel at your home.
This parallel approach is why we can typically complete cabinet installation in just 2 to 5 days once fabrication is done, compared to the weeks it can take when cabinets are measured, cut and assembled on-site from scratch. It also means significantly less dust, noise and disruption to your household during the installation phase itself.
Off-site fabrication also allows for tighter tolerances than on-site carpentry typically achieves. Panels are cut and welded in controlled conditions, so doors align correctly and drawers glide smoothly from the moment they're installed, rather than needing weeks of on-site adjustment to settle in.
This is particularly valuable for households that need to keep using part of their kitchen during the renovation. Because the bulk of the work happens off-site, we can often sequence installation to minimise the time your kitchen is completely unusable, an important consideration for larger families or households that cook daily.
Kitchen Renovation FAQs
Cabinets only typically range S$3,000 to S$7,500. Adding a new countertop brings it to S$5,500 to S$10,500, while a full makeover with layout changes ranges S$9,000 to S$16,000.
Most kitchen renovations take about 3 to 4 weeks total, including design, fabrication and installation, though scope and material availability can affect this.
Yes, we can reposition sinks, hobs and storage as part of a full renovation, subject to plumbing and gas line feasibility, which we assess during consultation.
We work with quartz and solid surface countertops in a range of finishes to match your cabinet colour and overall kitchen design.
What Singapore Homeowners Are Choosing in 2026
Open-concept kitchens that connect visually to the living area continue to be popular, particularly in newer BTO layouts designed with fewer internal walls. This often means kitchen cabinet finishes need to coordinate with adjacent living room furniture rather than standing alone.
Integrated appliance panels, where the fridge or dishwasher front matches the surrounding cabinetry, have also grown in popularity, creating a more seamless look, though this typically requires planning appliance choices before cabinet fabrication rather than after.
Keeping Your Kitchen Usable During Renovation
A full kitchen renovation doesn't have to mean weeks without any cooking facilities. We sequence demolition and installation where possible to minimise the period your kitchen is completely unusable, and can advise on temporary cooking arrangements for the short window when it is.
For households that cook daily, we recommend discussing this staging explicitly during your consultation so the timeline accounts for your household's actual routine, not just the fastest theoretical installation schedule.
Get a Free Quote for Your Kitchen Renovation
Free, no-obligation consultation and itemised quotation, before any work begins.





